tag:blogger.com,1999:blog-4646996060283937419.post3846840645914592377..comments2024-03-18T01:04:23.138+01:00Comments on managing agile....: Agilité: régie ou forfait?Anonymoushttp://www.blogger.com/profile/05500869519242058608noreply@blogger.comBlogger3125tag:blogger.com,1999:blog-4646996060283937419.post-13135474494054809052019-08-02T10:45:11.696+02:002019-08-02T10:45:11.696+02:00Ce billet est un immense contresens. Un des pilier...Ce billet est un immense contresens. Un des piliers de la culture agile c'est de sortir du triangle coût/périmètre/délais qui dans les faits rend fixe le périmètre et variable le coût et le délais (avec souvent en bonus une perte du quatrième critère caché: la qualité).<br />Dans la culture agile, on fixe un délais et un coût d'une part et on rend donc variable le périmètre d'autre part, soit exactement ce que propose la régie avec son obligation de moyens.<br />https://agilesutra.files.wordpress.com/2014/03/waterfall-agile-triangle-e1393717628690.jpg<br />C'est d'ailleurs exactement ce que propose la contractualisation agile:<br />http://www.contrat-agile.org/contrats/Contrat_Agile_V1.1.pdfMael MORELhttps://www.blogger.com/profile/04163609700884998035noreply@blogger.comtag:blogger.com,1999:blog-4646996060283937419.post-63234101919203478042014-06-24T14:36:27.981+02:002014-06-24T14:36:27.981+02:00The topic was... Agile contracts!The topic was... Agile contracts!Anonymoushttps://www.blogger.com/profile/05500869519242058608noreply@blogger.comtag:blogger.com,1999:blog-4646996060283937419.post-43081362446017118362014-06-24T08:24:27.547+02:002014-06-24T08:24:27.547+02:00It is the responsibility of the Scrum Master to e...It is the responsibility of the <a href="http://www.scrumstudy.com/scrum-master-certification.asp" rel="nofollow">Scrum Master</a> to ensure that the <a href="http://www.scrumstudy.com/scrum-product-owner-certification.asp/" rel="nofollow"> Product Owner</a> does not change requirements or acceptance criteria during the Sprint review and reject a done backlog item because it does not meet the changed requirements. If the requirements have changed, a Product Backlog item needs to be created to address the changed requirements in a future Sprint. <br /><br />Anonymoushttps://www.blogger.com/profile/09162411490140622429noreply@blogger.com